by Stuart Ginbey | Apr 20, 2016
The SCR room air conditioning units were in poor condition with a variety of faults and failures. This caused the main distribution panels to shut down and it was critical that these systems were repaired immediately. We received an emergency callout to the Ensco 70...
by Stuart Ginbey | Apr 20, 2016
During major drilling operations, the SCR room overheats due to increased electrical load on the cabinets and not enough cooling capacity on the originally installed AC units. We were invited to complete a detailed Heat Load Analysis prior to installation of new air...