The SCR room air conditioning units were in poor condition with a variety of faults and failures. This caused the main distribution panels to shut down and it was critical that these systems were repaired immediately.
We received an emergency callout to the Ensco 70 and mobilized immediately. All x3 systems were repaired and commissioned over a 3 day period, however room temperatures were returned to normal within 8hrs of being on site.