Ensco 72 SCR Heat Load Analysis (Ensco) – Denmark

During major drilling operations, the SCR room overheats due to increased electrical load on the cabinets and not enough cooling capacity on the originally installed AC units. We were invited to complete a detailed Heat Load Analysis prior to installation of new air conditioning units. This identified that the required cooling duty was actually double the capacity that was installed. We are currently procuring the new units and look forward to replacing them in March 2014.

Skills

Posted on

20th April 2016