Project 626 We were approached Late last year to design, upgrade, supply and replace a chilled water system onboard a 71m vessel. Our client also required an overhaul of the Provisions onboard to include removing the existing refrigerant and replacing with a more...
by Stuart Ginbey | Dec 8, 2020
The vessel Lady Bower is an LNG Tanker. Tradewinds were mobilised to Las Palmas in Gran Canaria in December 2020, to replace all of the refrigerant R404A in the refrigeration and air conditioning systems. Other works included replacing the evaporator coil in the...
by Stuart Ginbey | May 22, 2017
by Stuart Ginbey | Apr 22, 2017