by Stuart Ginbey | Apr 20, 2016
AHU Replacement FEED Study The North Alwyn platform has been experiencing significantly high pressurization problems throughout the living quarters. During our offshore survey visit, we were able to resolve the pressurization issues which have been a concern for quite...
by Stuart Ginbey | Apr 20, 2014
Tradewinds Engineering were contracted directly by Total E&P UK to conduct a full design review of all HVAC and Refrigeration equipment on board the North Alwyn Alpha and Bravo platforms. Thorough heat load calculations were carried out to confirm the cooling...
by Stuart Ginbey | Apr 20, 2013
As consultants, we were asked to carry out an offshore survey and report on the R22 refrigerant that needs to be replaced in their cooling systems. An F Gas equipment register was produced, along with an implementation strategy to either retrofit or replace the...