A Health & Safety concern was raised by catering staff about the amount of water underneath the floor of the walk-in chiller. We removed the old floor and disinfected the whole area. A new floor was installed including additional supports to reduce flexing of the floor plates due to traffic. The evaporator coil was disinfected and a new drain was installed throughout.