by Stuart Ginbey | Feb 28, 2024
Project 626 We were approached Late last year to design, upgrade, supply and replace a chilled water system onboard a 71m vessel. Our client also required an overhaul of the Provisions onboard to include removing the existing refrigerant and replacing with a more...
by Stuart Ginbey | Mar 28, 2022
March 2022 – Design, Supply and Installtion of new provisions refrigeration system In March 2022, we completed the upgrade of the provisions refrigeration system onboard the M/Y Helios in La Ciotat Shipyard in France. The yacht has x1 walk-in Coolroom and x1...
by Crissie Osborne | Mar 28, 2022
Tradewinds were asked to attend an emergency callout to repair a leak on circuit 1 of the main air conditioning chiller. The leak was quickly identified and repaired by replacing the 2 service shutoff valves on the compressor. The glands on other valves were also...
by Crissie Osborne | Mar 28, 2022
Tradewinds Engineering were asked to attend site, onboard the MY Seadar in Rhodes, Greece, to troubleshoot faults on the Air Conditioning equipment. The callout was completed between 8th and 11th August 2021. The system was found to be short of refrigerant which was...
by Stuart Ginbey | Nov 22, 2018